Project Update: first and second floor work continues



A few projects have been completed in the pavilion entrance of the building including the installation of the reception desk, painting, and flooring. The flooring in this area includes stone tile on the main floor and wood on the the stair treads connecting the entrance to the second floor.

The wood chosen for the Pavilion stairway is called Ipe. Ipe, pronounced "ee-pee," is also known as "Brazilian Hardwood" and is one of the hardest woods known to man. It is a deep dark brown colored wood with exceptionally fine graining. It is one of the densest woods available and is fire resistant. The exterior stairs are also being laminated with Ipe.



Fourteen welding booths have been received and installed in the welding area. This is located on the Northeast portion of the building and the large glass windows makes this training area visible to those traveling on the Expressway.


Meanwhile, interior signage has been hung throughout the building. These include office numbers, room names (i.e. electrical closet, pump room), non-electric life and safety signs (exit signs), floorplan signs, and fire alarm pull switches.



Finished lighting fixtures, which are complete on the third floor, are being installed on the second floor.


Elevator inspections were held last week. Each elevator (passenger, freight, and wheel chair lift) passed inspection. Fire alarm inspections are scheduled to happen this week. Boston Inspectional Services will conduct initial inspections and provide a temporary certificate of occupancy, which will give clearance for furniture to be moved in to the space. The Final inspection is slated for January 28th.