Friday, May 15, 2009

MEP Work Begins



MEP-- Mechanical, electrical and plumbing (including HVAC and sprinkler system), work is ongoing at the Carpenters Center.

EM Duggan is running the rough plumbing under the first floor slab. As you can see in this picture, the pipe work currently runs from the first floor to underneath the second floor slab. When the steel structure and new concrete slab for the second and third floors are set, the plumbing work will continue through those floors as well.



Conduit for the electrical work is being installed. Electrical conduit is metal or plastic pipe through which electrical wires are pulled, it houses and protects the wires.


The electrical foreman, working for McDonald Electrical Corp.