Monday, April 27, 2009

Gravel Fill, Duct Bank Work

Stone back fill was poured around the five storm water septor tanks. The stone allows the water to disperse slowly back into the ground.



This is a view from above looking down at the tanks. In the forefront of the shot the rebar located at the southwest portion of the pavilion. A concrete slab will be poured here for what will become the pavilion floor.



Additionally, electrical duct bank work was done this week. This provides electrical service from the street to the transformer pad located at the south side of the building under the future parking deck. Concrete will be poured between the Styrofoam forms seen here to encase the electrical conduit.